|
|
|
Licavoli Lodge remodel begins on 10/14. The morning greeted the guys with snow.
|
|
|
|
Pre-rehab condition.
|
|
|
|
The crew l-r Keith Perior, Gary Green, Joe Robbins, Dom Licavoli, Frank Licavoli & Sam as photographer
|
|
|
|
|
Joe
|
|
|
|
|
The work begins.
|
|
|
|
Burning of the old facade.
|
|
|
|
Exposed wall by noon.
|
|
|
|
Rough framing.
|
|
|
|
|
|
|
Had to close the openings by dark.
|
|
|
|
The morning of 10/15.
|
|
|
|
|
|
|
|
Grey water trench.
|
|
|
|
Frank is the resident plumber.
|
|
|
|
Roof work.
|
|
|
|
|
|
|
Sam hauls tar.
|
|
|
|
|
|
|
|
|
The Guys
|
|
|